The step-by-step assembly process follows this sequence:
1. Site Preparation: Ensure you have a completely level and supporting base (100% level is essential)
2. Foundation Setup: Install foundation beams (pressure-treated beams included)
3. Part Identification: Sort components by size using the building plan and packing list
4. Wall Construction: Stack wall logs using our interlocking double tongue and groove system
5. Roof Installation: Fit gables, roof rafters (purlins), and tongue and groove roof boards
6. Finishing: Install doors, windows, storm braces, and weather protection then tongue and tongue and groove flooring