What about the floor installation?

Floor installation is typically the first major step:

Foundation Beams: Place pressure-treated foundation beams with 400mm centered spacing
First Log Course: Position and screw the first row of logs around the perimeter
Check Square: Measure corner to corner to ensure the floor is perfectly square
Floorboard Installation: Lay tongue and groove floorboards with 5mm expansion gaps
Nailing: Secure each board with 40mm nails as provided
Final Board: The last floorboard may need cutting to fit properly