Floor installation is typically the first major step:
• Foundation Beams: Place pressure-treated foundation beams with 400mm centered spacing
• First Log Course: Position and screw the first row of logs around the perimeter
• Check Square: Measure corner to corner to ensure the floor is perfectly square
• Floorboard Installation: Lay tongue and groove floorboards with 5mm expansion gaps
• Nailing: Secure each board with 40mm nails as provided
• Final Board: The last floorboard may need cutting to fit properly
What you get when you write to us:
Error: Contact form not found.